Hosted P6 vs Oracle Primavera Cloud: two different decisions.
Oracle Primavera Cloud is a different product with a different data model. Choosing it means leaving P6. LoadSpring hosts and manages the P6 you already use. The first question is whether you need a different scheduling tool or a better environment for P6.
OPC is the right answer for some environments and we say where below. This page exists so you pick correctly, not so you pick us
The one-question test
Decided to leave P6 for a new product? OPC belongs on your shortlist.
Keeping P6 and done with running infrastructure? That is LoadSpring.
Hybrid environments run P6 here with OPC connected, data unified across the two.
Hosted P6 and Oracle Primavera Cloud, compared.
| Comparison point | Oracle Primavera Cloud | P6 on LoadSpring |
|---|---|---|
| What it is | A different Oracle product with its own data model | Your P6: configs, layouts, integrations intact |
| What migrates | Your data, converted into the new product | Your environment, moved as it is |
| Retraining | New product, new workflows for schedulers | None: the same P6 your team already runs |
| Customization & integrations | Rebuilt against the new platform where supported | Inventoried and rebuilt before cutover, then kept |
| Database access | Product APIs and exports | Direct access preserved for reporting and BI |
| The rest of the environment | Oracle stack orientation | 200+ applications beside P6, one data layer |
| Support | Oracle Support | Live support, response in as little as 15 minutes, 24/7/365 when systems are down |
| Exit | Product-format export | Native format, no egress fee |
| Right when | You have decided P6's successor should be OPC | You want P6's power without P6's infrastructure |
OPC is a capable product and for teams committed to leaving P6 it deserves a fair evaluation, including of the questions above. The five-question framework in the vendor-cloud guide applies to any vendor's cloud, Oracle's included.
Running P6 and OPC together.
Plenty of environments are hybrid on purpose: P6 for the programs that depend on its depth, OPC where Oracle's roadmap fits. LoadSpring hosts and manages the P6 side; OPC stays with Oracle, and the two can be connected, so scheduling continues in P6 while OPC adds capabilities.
What to bring to the conversation
Your schedule sizes, the integrations that matter and your license position. We talk through whether hosted P6, OPC or both fit your programs, and follow up with a plan and a quote.
Prefer to check your environment first? Take the P6 readiness assessmentFrequently asked questions.
Is Oracle Primavera Cloud the same as Primavera P6?
No. Oracle Primavera Cloud is a different product with a different data model. Choosing it means leaving P6, with configurations, layouts and integrations rebuilt where supported.
Can we keep P6 and stop running the servers ourselves?
Yes. Hosted at LoadSpring, P6 stays P6: your configurations, layouts and integrations intact, on infrastructure sized for large schedules, typically live within two weeks.
Can we run P6 and Oracle Primavera Cloud together?
Yes. LoadSpring hosts and manages the P6 side; OPC stays with Oracle, and the two can be connected so scheduling continues in P6 while OPC adds capabilities. LoadSpring Data™ can reconcile their data so the portfolio reads as one.
How should we evaluate a move to Oracle Primavera Cloud?
The vendor-cloud guide sets out the five questions to settle first: the data model, integrations, customizations, exit terms and the other applications in your environment.